整个建造过程分为10个步骤

建造流程图

请与我们韦德注册平台

在咨询了我们的网站之后, you find that we are 最有可能的 the architects to deliver what you are seeking and you contact us 在这里.

2 |初次见面

如果你还没有读过我们的帖子 与架构师的初次会面,你可能想从这里开始. 一般, every project we engage in begins with an initial meeting that takes from an hour or two, 取决于范围. 我们会询问你的预算和时间安排, 了解你的视力和喜好, and engage in a dialogue to ensure that our design philosophy will align with yours.

Since we’ve been 设计 spaces for the past twenty-three years, we understand that translating your vision with good design is the most important aspect of the relationship we establish, 这样结果就是你想要的, 和更多的!

提案与合同

在我们深入研究这个过程之前, we like to send you a proposal outlining all we discussed and what our anticipated fees might be. Transparency being a critical component of our business, we typically charge hourly as we feel it’s the fairest to both parties and this is how we represent accurately all our costs to our clients.

去你的网站实地考察

One of the key elements to 设计 any project is visiting the site and seeing the type of amenities it has: if t在这里 are trees and w在这里, 一个斜坡, 太阳的方向是什么, 任何潜在的观点, 或者一个被阻挡. 如果可能的话,我们想要一份场地平面图, go to that property with a compass and swing view angles of distant mountain peaks, 一条河, 邻居的房子, 或者任何值得注意的景观特征. 我们可以利用其他资源,比如 提顿县地理信息系统, 收集的框架, 管理和分析数据, to deepen our investigation when necessary; for example, 需要更多地了解洪泛区, 或者自然资源覆盖, 或者当财产受到各种限制时. All this information goes on the site plan so that when we start 设计 the building we have a good idea w在这里 the optimal placement of specific parts of the structure might be.

5 |方案设计

This is the first attempt at design, being done by either Kurt Dubbe or Chris Moulder. 我们工作很快, 草图, 设计, 并以快速的速度起草想法, and generally do it at a smaller scale of 1/8”=1’-0”. 然后我们翻译结果——非常粗糙的图画, 变成一个像样的布局, very accurate yet highly editable: the intention is to show that we can modify anything easily and you won’t feel committed to a design you’re not set on. 例如, placing furniture on the design lets you relate to the space; understanding how you might move within it, 你可能想要改变它的某些方面. This schematic design phase is the very essence of translating an abstract thought to something legible that you can understand. Its goal is to further our dialogue by eliciting a response and a sense that this direction is the one you want to move forward with.

视野变窄

We now can go from a few presented ideas down to one. The drawings scale moves up to ¼”=1’=0” in a more refined capacity. You’re satisfied with the general floor plan we’ve proposed and we turn to generating renderings on the computer using our complete in-house CAD services, 完整的图形和3d建模功能. These CAD drawings outline the envelope of the building (walls, 板的高度, 预期的建筑结构, 是手工框还是桁架, 桁架会是什么样子, 等). 此时此刻, we can refine surfaces of the project and investigate it in three dimensions to ensure that the overall result is what we initially imagined, 同时也巩固了你的想法.

7 |承包商招标

一旦我们有了平面图, 海拔高度, 和场地规划包放在一起, it’s sufficient to initiate a conversation with a potential contractor, 或承包商, and have them meet with you to find the right match, not just from a price stand-point but also a personality one. This is when negotiations with the contractors happens. We’ll give them enough information to provide us with an estimate of what they feel it might cost to build. During this time (a significant portion of the fee) you’re able to discuss with the contractor what their business philosophy might be, 或者他们对你的要求会有什么反应. We need to underline 在这里 the importance of all parties seeing eye-to-eye, otherwise it could be a difficult and unpleasant building process. 当然, t在这里 is the occasional situation w在这里 you might already have a contractor for your project and this step is minimized.

8 |施工文件

Now that we have all ideas refined and all the details we needed from you, 我们为承包商准备图纸, 分包商和商人. 通常, 在这个阶段的末尾, the constructions drawings are complete enough for the contractor to provide you with a much more accurate estimate encompassing most details (with an allowance for more). If you judge it acceptable, you sign and enter into a contract with them.

9 |建设管理

此时此刻, it is implied a building permit has been issued from the appropriate governing authority, and their code requirements and other submission requirements are met. Construction can begin but we don’t step aside as we continue to supervise and mediate the process, so that everyone is doing their job properly and in a timely manner. Note that this doesn’t mean modifications are not possible, changes can still occur: unforeseeable factors can happen, for example a large stone ledge that was not detected while testing the grounds, 或是一片贫瘠的土壤. This is when the contractor will submit to us a Change Order; we will review it with you, 批准它, 这样就会调整建筑预算. It is done in a formal way so that all parties know what the final number will be.

The construction phase being the longest until completion, 你会, 最有可能的, have more questions and we will be t在这里 to answer them. This is how we ensure you understand the whole construction process, 相信一切都在按计划进行, and that all parties are mutually excited about the end result.

10 |搬进来

Once a certificate of occupancy has been approved by a qualified inspector, 你已经准备好搬进来,享受你的新家了!